IJsei, Amsterdam

De Boer Snijbedrijf has cut 200 tons of steel to size for the IJsei project in Amsterdam. That is the name for all plans to be realised on the IJ side of Amsterdam Central Station until 2010. The steel we cut to size is intended for the structure on which the fendering will be installed. This fendering can resist very heavy loads.